WASHINGTON, DC 20024 · DC — Ward 6
Building permit — alteration and repair
Interior renovation to add ceiling fan in Boiler Room for Mechanical Room ventilation and label combustion air duct work for Boiler Room in Plan.
Applicant: DFM PERMITS · Owner: PARK INN ASSOCIATIES LP
Building permit — elevator - repair
Install New Island Drop Ceiling constructed of aluminum T-Frame with Thermoclear lenses, and LED Strip Lights. New Upper side and Rear wall panels constructed of FR wood substrate faced with Plastic Laminate. Lower Wall Panels constructed of FR wood substrate faced with Textured #4 stainless steel. Handrails Steel Flatbar.
Applicant: MARLIN SULLIVAN · Owner: PARK INN ASSOCIATIES LP
Building permit — boiler
Owner: PARK INN ASSOCIATIES LP
Building permit — electrical
Owner: PARK INN ASSOCIATIES LP
Building permit — alteration and repair
Site of Town Center East REVISION TO ORGINAL PERMIT #3 B2307169 (REVISIONS #2 B2508038) IN ORDER TO ADD SECURITY SYSTEM AND LOW VOLTAGE COMPONENTS TO ELECTRICAL FLOOR PLANS.
Applicant: DFM PERMITS · Owner: PARK INN ASSOCIATIES LP
Building permit — electrical
Owner: PARK INN ASSOCIATIES LP
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.