SILVER SPRING, MD, 20910 · Montgomery County
Building permit — commercial building
Alteration of one room from copy room to IDF room. Inclusion of one door in existing cased opening with card reader. This project does not alter existing occupant loading, door capacity, or travel distances.
Building permit — commercial building
Revision,1 - Drawing clarifications made for construction. No change to design/construction scope or cost.Customer Wants To Use ePlansCustomer Wants To Use ePlans,Replacement of steam generators and humidification module at (2) existing rooftop air handling units and addition of (2) backup rooftop steam generators. This project does not alter existing occupant loading, door capacity, or travel distances.
Building permit — commercial building
Install (2) Rooftop humidifiers and (1) 1st Floor RO unit
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.