  1. Building permit issuedFeb 3
  2. Building permit issuedFeb 9
  3. Building permit issuedMar 23
  4. Building permit issuedApr 1
  5. Building permit issuedMay 29
  6. Building permit issuedSep 15
DC-BP2605566
PERMIT ISSUED

Building permitbuilding

Applicant: NICK GOLDSTEIN · Owner: WASHINGTON HOSPITAL CENTER

Issued Sep 15, 2026
DC-BCIV2600061
PERMIT ISSUED

Building permitcivil plans

THE MEDSTAR NATIONAL REHABILITATION HOSPITAL (NRH) NORTH AMBULANCE PROJECT CONSISTS OF THE CONSTRUCTION OF AN ADDITIONAL AMBULANCE ENTRANCE ON THE NORTHERN SIDE OF THE NRH BUILDING. THE PROJECT WILL INCLUDE NEW PAVEMENT, CURBING, SIDEWALK, ENTRANCE CANOPY, DOORWAY, AND ASSOCIATED GRADING TO ACCOMMODATE THE NEW AMBULANCE ACCESS. LIMITED SITE CLEARING WILL BE REQUIRED, INCLUDING THE REMOVAL OF TWO EXISTING TREES WITHIN THE PROPOSED IMPROVEMENT AREA. EXISTING UTILITIES WILL REMAIN IN PLACE AND BE PROTECTED DURING CONSTRUCTION. THE LIMIT OF DISTURBANCE FOR THE WORK IS SHOWN WITHIN THE PLAN SET AND DOES NOT EXCEED 5,000 SF; THEREFORE, NO STORMWATER MANAGEMENT DESIGN HAS BEEN INCLUDED. EROSION AND SEDIMENT MEASURES HAVE BEEN PROVIDED FOR CONSTRUCTION. ALL WORK ON THIS PROJECT IS WITHIN THE EXISTING MEDSTAR CAMPUS, NO PROPOSED WORK IN PUBLIC SPACE. "NEW ENTRANCE CANOPY AND DOORWAY WILL BE INSTALLED AS PART OF AN ADJACENT BUILDING PERMIT ((B2603022).

Applicant: KHEIRA BEKKADJA · Owner: WASHINGTON HOSPITAL CENTER

Issued May 29, 2026
DC-P2606174
PERMIT ISSUED

Building permitplumbing and gas

Owner: WASHINGTON HOSPITAL CENTER

Issued Apr 1, 2026
DC-M2602138
PERMIT ISSUED

Building permitmechanical

Owner: WASHINGTON HOSPITAL CENTER

Issued Mar 23, 2026
DC-E2605339
PERMIT ISSUED

Building permitelectrical

Owner: WASHINGTON HOSPITAL CENTER

Issued Feb 9, 2026
DC-P2604185
PERMIT ISSUED

Building permitplumbing and gas

Owner: WASHINGTON HOSPITAL CENTER

Issued Feb 3, 2026

Property record

SSL 3129 0804
Lot
1,630,998 sq ft
Assessed
$300,250,900
Land / improvements
$100,648,890 / $199,602,010

Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.

DC building
current to Sep 21, 2026
← Browse all permitsSearch this address in the feed →