WASHINGTON, DC 20036 · DC — Ward 2
Building permit — plumbing and gas
Owner: BLAKE DEVELOPMENT COMPANY
Building permit — alteration and repair
THIRD WAY - LEVEL 2 INTERIOR ALTERATION. WORK TO INCLUDE DEMOLITION, MECHANICAL, ELECTRICAL AND FINISHES. NO STRUCTURAL WORK IS REQUIRED. FURNITURE FOR REFERENCE ONLY, AND NOT IN SCOPE. NO CHANGE IN OCCUPANCY USE.
Applicant: JOPATRIC LOVE · Owner: BLAKE DEVELOPMENT COMPANY
Building permit — electrical
Owner: BLAKE DEVELOPMENT COMPANY
Building permit — plumbing and gas
Owner: BLAKE DEVELOPMENT COMPANY
Building permit — electrical
Owner: BLAKE DEVELOPMENT COMPANY
Building permit — plumbing and gas
Owner: BLAKE DEVELOPMENT COMPANY
Building permit — alteration and repair
Facade repair and restoration on the east elevation of the building. Work shall include installing relief angles and flashing, Perform isolated brick repointing, perform isolated brick replacement, install isolated brick expansion joints, install new joint sealants.
Applicant: BRENDAN T. O'LEARY · Owner: BLAKE DEVELOPMENT COMPANY
Building permit — alteration and repair
NEW INTERIOR ALTERATION OF THE 2ND FLOOR. THE WORK CONSISTS OF NON STRUCTURAL DEMOLITION, AND NEW GENERAL PLUMBING, ELECTRICAL, AND MECHANICAL WORK. NO STRUCTRUAL WORK IS REQUIRED. THERE IS NO CHANGE OF USE. TOTAL AREA OF WORK: 4,908 USF.
Applicant: CHRIS VU / THUY LE · Owner: BLAKE DEVELOPMENT COMPANY
Building permit — miscellaneous
AFTER HOURS WORK RELATED TO B2506669
Applicant: PERMIT EXPRESS · Owner: BLAKE DEVELOPMENT COMPANY
Building permit — miscellaneous
AFTER HOURS WORK RELATED TO B2506669
Applicant: PERMIT EXPRESS · Owner: BLAKE DEVELOPMENT COMPANY
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.