WASHINGTON, DC 20007 · DC — Ward 2
Building permit — miscellaneous
Interior tenant build out on 6th floor
Applicant: MEGAN TURNER · Owner: MA REPLEO HOLDING CORP
Building permit — plumbing and gas
Owner: MA REPLEO HOLDING CORP
Building permit — miscellaneous
Interior tenant build out
Applicant: MEGAN TURNER · Owner: MA REPLEO HOLDING CORP
Building permit — electrical
Owner: MA REPLEO HOLDING CORP
Building permit — miscellaneous
Interior tenant buildout
Applicant: MEGAN TURNER · Owner: MA REPLEO HOLDING CORP
Building permit — mechanical
Owner: MA REPLEO HOLDING CORP
Building permit — electrical
Owner: MA REPLEO HOLDING CORP
Building permit — electrical
Owner: MA REPLEO HOLDING CORP
Building permit — plumbing and gas
Owner: MA REPLEO HOLDING CORP
Building permit — alteration and repair
CFA / H FOLLOWING ARE THE PLANS OUTLINING THE SCOPE OF WORK REQUIRED FOR GODSPEED CAPITAL AT 1055 THOMAS JEFFERSON STREET NW, LEVEL 06, WASHINGTON, DC 20007. THE SPACE IS A NEW INTERIORS BUILD OUT IN AN EXISTING BUILDING WITH WORK SET TO INCLUDE CONSTRUCTION OF NEW PARTITIONS, CEILING, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION AS INDICATED ON DRAWINGS.
Applicant: ERIC ASHER · Owner: MA REPLEO HOLDING CORP
Building permit — plumbing and gas
Owner: TRANSWESTERN
Building permit — electrical
Owner: MA REPLEO HOLDING CORP
Building permit — plumbing and gas
Owner: MA REPLEO HOLDING CORP
Building permit — electrical
Owner: MA REPLEO HOLDING CORP
Building permit — electrical
Owner: MA REPLEO HOLDING CORP
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.