WASHINGTON, DC 20010 · DC — Ward 5
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — alteration and repair
Suite 321. Alteration of existing demised space for tenant fit-out of doctor's office for The Neurology Center
Applicant: FAYLAND NG · Owner: WASHINGTON HOSPITAL CENTER
Building permit — mechanical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — boiler
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — alteration and repair
SUITE 4800 -- MINOR DEMOLITION, TENANT IMPROVEMENT/ALTERATIONS TO INTERIOR BUILD OUT OF NON-LOAD BEARING PARTITIONS AND INSTALLATION OF FURNITURE IN EXISTING OCCUPIED SPACE. NO STRUCTURAL MODIFICATIONS REQUIRED. AREA AFFECTED 1281 SF
Applicant: THUY LE / CHRIS VU; RP BUILDERS LLC · Owner: WASHINGTON HOSPITAL CENTER
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.