WASHINGTON, DC 20010 · DC — Ward 5
Building permit — electrical
Electrical Trade Permit
Applicant: MIGUEL GUTIERREZ · Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Electrical Trade Permit
Applicant: MIGUEL GUTIERREZ · Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — mechanical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — mechanical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — alteration and repair
Temporary piping and wiring for temporary rented cooling towers
Applicant: CHRIS WING · Owner: WASHINGTON HOSPITAL CENTER
Building permit — alteration and repair
Alterations and repair for the connections of a temporary boiler to the existing boiler.
Applicant: COLIN F CLARK · Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — alteration and repair
MODIFY AN EXISTING WET SPRINKLER SYTSTEM. TOTAL SPRIKLER HEADS TO BE INSTALLED IS 19
Applicant: BILL SAUNDERS · Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Electrical Trade Permit
Applicant: MIGUEL GUTIERREZ · Owner: WASHINGTON HOSPITAL CENTER
Building permit — alteration and repair
LEVEL 2 ALTERATION OF THE EXISTING SPD (CENTRAL STERILE PROCESSING DEPARTMENT) LOCATED WITHIN BASEMENT OF THE EXISTING MAIN BUILDING OF THE MEDSTAR WASHINGTON HOSPITAL CENTER, INCLUDING REPLACEMENT OF EXISTING PROCESSING SINKS AND ADDING NEW SINKS & SONIC WASHERS. ALTERATIONS WILL INCLUDE UPDATED FINISHES TOMEET UP-TO-DATE STANDARDS. A HYDRONIC CUSTOM AIR HANDLING UNIT IS BEING ADDED TO THE ROOF TO REPLACE A FAILING AIR HANDLING UNIT SERVING THE STERILE PROCESSING DEPARTMENT AND PHARMACY. STERILE PROCESSING DEPARTMENT EXHAUST FANS WILL ALSO BE REPLACED. EXISTING WALL AND DOOR CONFIGURATION WILL NOT BE AFFECTED BY RENOVATION. EXISTING EGRESS CONFIGURATION WILL NOT CHANGE. EXISTING WORK AREA OCCUPANCY COUNT WILL NOT CHANGE.
Applicant: JEREMY KARGON · Owner: WASHINGTON HOSPITAL CENTER
Building permit — mechanical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — alteration and repair
THE PROJECT CONSISTS OF INTERIOR RENOVATIONS (ALTERATIONS LEVEL 2) TO THE G126 SPACE LOCATED AT THE GROUND FLOOR OF MEDSTAR WASHINGTON HOSPITAL CENTER. THIS PROJECT COMPRISES TWO PHASES: PHASE A (CONSTRUCTION): RENOVATION OF TWO HYBRID OPERATING ROOMS AND ANCILLARY SPACES PHASE B (EQUIPMENT ONLY): INSTALLATION OF HYBRID IMAGING EQUIPMENT
Applicant: JEREMY KARGON · Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — boiler
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — alteration and repair
Interior renovations of the 5th floor will create new offices, exam/consult rooms, and support spaces. The NICU locker room will be relocated to allow for additional exam rooms and EP Storage. The Lactation Suite will move to the 2nd floor.
Applicant: DAVID BEYER · Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — alteration and repair
BFPE International has been contracted to provide a new clean agent fire suppression panel for the Washington Hospital Center project located at 110 Irving St NW. The system will protect Room 1B3A. The new panel shall be a one for one replacement of the existing faulty FSCP.
Applicant: BILL SAUNDERS · Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Building permit — mechanical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — electrical
Owner: WASHINGTON HOSPITAL CENTER
Building permit — plumbing and gas
Owner: WASHINGTON HOSPITAL CENTER
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.