WASHINGTON, DC 20005 · DC — Ward 2
Building permit — miscellaneous
INTERIOR BUILD OUT OF 6TH, 7TH & 8TH FLOORS WITH ADDITION OF INTERCONNECTING STAIR AND SLAB OPENING OVERLOOK. SCOPE INCLUDES NEW FINSHES, MECHANICAL, PLUMBING, ELECTRICAL, AND STRUCTURAL WORK.
Applicant: IVAN URCIA · Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — alteration and repair
**No Structural Work** THIS PROJECT CONSISTS OF THE 1ST FLOOR DEMOLITION OF EXISTING INTERIOR TENANT PARTITIONS, CEILING, AND SYSTEMS. SELECTED EXIT SIGNS AND LIGHT FIXTURES TO BE RELOCATED AND RE-INSTALLED TO MAINTAIN LIGHTING LEVELS REQUIRED BY CODE. INTENT TO CREATE A WHITE-BOX SPACE FOR FUTURE BUILD-OUTS
Applicant: OLUFELA PYNE · Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
INTERIOR BUILD OUT OF 6TH, 7TH & 8TH FLOORS WITH ADDITION OF INTERCONNECTING STAIR AND SLAB OPENING OVERLOOK. SCOPE INCLUDES NEW FINSHES, MECHANICAL, PLUMBING, ELECTRICAL, AND STRUCTURAL WORK.
Applicant: SHAROYA SIMMONS · Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
INTERIOR BUILD OUT OF 6TH, 7TH & 8TH FLOORS WITH ADDITION OF INTERCONNECTING STAIR AND SLAB OPENING OVERLOOK. SCOPE INCLUDES NEW FINSHES, MECHANICAL, PLUMBING, ELECTRICAL, AND STRUCTURAL WORK.
Applicant: IVAN URCIA · Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
After-hours construction, Monday to Sundays, 7:00PM to 7:00AM, for permit B2601867
Applicant: DAVID THOMAS FONTANA · Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — alteration and repair
Revision to permit application No.?B2601867. Changes include revisions to room types/occupancy, partition layouts, door locations, power quantities & locations, lighting fixtures and controls, and relocation of mechanical equipment. Area affected 31,824 SF
Applicant: OLUFELA PYNE · Owner: 1100 15TH STREET LLC
Building permit — plumbing and gas
Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
INTERIOR BUILD OUT OF 6TH, 7TH & 8TH FLOORS WITH ADDITION OF INTERCONNECTING STAIR AND SLAB OPENING OVERLOOK. SCOPE INCLUDES NEW FINSHES, MECHANICAL, PLUMBING, ELECTRICAL, AND STRUCTURAL WORK.
Applicant: IVAN URCIA · Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
After-hours construction, Monday to Sundays, 7:00PM to 7:00AM, for permit B2601867
Applicant: DAVID THOMAS FONTANA · Owner: 1100 15TH STREET LLC
Building permit — plumbing and gas
Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
INTERIOR BUILD OUT OF 6TH, 7TH & 8TH FLOORS WITH ADDITION OF INTERCONNECTING STAIR AND SLAB OPENING OVERLOOK. SCOPE INCLUDES NEW FINSHES, MECHANICAL, PLUMBING, ELECTRICAL, AND STRUCTURAL WORK.
Applicant: IVAN URCIA · Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
After-hours construction, Monday to Sundays, 7:00PM to 7:00AM, for permit B2601867
Applicant: DAVID T FONTANA · Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — plumbing and gas
Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
INTERIOR BUILD OUT OF 6TH, 7TH & 8TH FLOORS WITH ADDITION OF INTERCONNECTING STAIR AND SLAB OPENING OVERLOOK. SCOPE INCLUDES NEW FINSHES, MECHANICAL, PLUMBING, ELECTRICAL, AND STRUCTURAL WORK.
Applicant: IVAN URCIA · Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
After hours for various holidays per approved ANC letter for B2601867: DC Emancipation Day: Wednesday, April 16, 2026, Memorial Day: Monday, May 25, 2026, Juneteenth National Independence Day: Friday, June 19, 2026, Independence Day: Friday, July 3, 2026.
Applicant: DAVID T FONTANA · Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — plumbing and gas
Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
After-hours construction, Monday to Friday, 7:00PM to 7:00AM, for permit B2601867
Applicant: DAVID T FONTANA · Owner: 1100 15TH STREET LLC
Building permit — plumbing and gas
Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
INTERIOR BUILD OUT OF 6TH, 7TH & 8TH FLOORS WITH ADDITION OF INTERCONNECTING STAIR AND SLAB OPENING OVERLOOK. SCOPE INCLUDES NEW FINSHES, MECHANICAL, PLUMBING, ELECTRICAL, AND STRUCTURAL WORK.
Applicant: IVAN URCIA · Owner: 1100 15TH STREET LLC
Building permit — plumbing and gas
Owner: 1100 15TH STREET LLC
Building permit — mechanical
Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — electrical
Owner: 1100 15TH STREET LLC
Building permit — mechanical
Owner: 1100 15TH STREET LLC
Building permit — plumbing and gas
Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
INTERIOR BUILD OUT OF 6TH, 7TH & 8TH FLOORS WITH ADDITION OF INTERCONNECTING STAIR AND SLAB OPENING OVERLOOK. SCOPE INCLUDES NEW FINSHES, MECHANICAL, PLUMBING, ELECTRICAL, AND STRUCTURAL WORK.
Applicant: GRACE MAU · Owner: 1100 15TH STREET LLC
Building permit — miscellaneous
INTERIOR BUILD OUT OF 6TH, 7TH & 8TH FLOORS WITH ADDITION OF INTERCONNECTING STAIR AND SLAB OPENING OVERLOOK. SCOPE INCLUDES NEW FINISHES, MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL WORK.
Applicant: IVAN URCIA · Owner: 1100 15TH STREET LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.