WASHINGTON, DC 20002 · DC — Ward 5
Building permit — alteration and repair
INSTALLING NEW OVERHEAD ROLL-UP GARAGE DOOR AND NEW SIDE ACCESS DOOR.
Applicant: MASTER IN REMODELING ADDITION, LLC · Owner: MASTER IN REMODELING ADDITION, LLC
Building permit — mechanical
Owner: MASTER IN REMODELING ADDITION, LLC
Building permit — electrical
Owner: MASTER IN REMODELING ADDITION, LLC
Building permit — plumbing and gas
Owner: MASTER IN REMODELING ADDITION, LLC
Building permit — addition alteration repair
1.Interior renovation to include new framing, drywall, doors, trim, cabinets, painting, and flooring.2.Replacement of the existing 4-inch basement slab.3.Rebuild the existing interior staircase.4.Demolish the existing rear addition and rebuild a new rear addition.5.Replace all existing windows and doors; install new doors and windows as shown on plans.6.Rebuild the existing front porch and porch roof.7.Rebuild the rear stairs.8.Replace the electrical, mechanical, and plumbing systems in full.9.Add two full bathrooms and one half bathroom.
Applicant: HERIBERTO MIRA · Owner: JOHNSON, MARY L
Building permit — building
Applicant: HEDIBERTO MIRA · Owner: MASTER IN REMODELING ADDITION, LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.