WASHINGTON, DC 20020 · DC — Ward 8
Building permit — alteration and repair
Historic District We have changed front entry so that now it will be under the existing front porch. We also moved the location of our new meters to the right side of the front of the house facing the side of the porch. Both of these changes were in consultation with Historic Preservation staff. Additionally, we want to take out one additional interior wall for replacement and we wish to replace the approved central HVAC system with two mini split units.
Applicant: MOGUL, KENNETH · Owner: MOGUL, KENNETH
Building permit — electrical
Owner: MOGUL, KENNETH
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.