WASHINGTON, DC 20036 · DC — Ward 2
Building permit — electrical
Owner: REEP-OFC 1111 19NW DC LLC
Building permit — plumbing and gas
Owner: REEP-OFC 1111 19NW DC LLC
Building permit — plumbing and gas
Owner: REEP-OFC 1111 19NW DC LLC
Building permit — plumbing and gas
Owner: REEP-OFC 1111 19NW DC LLC
Building permit — electrical
Owner: REEP-OFC 1111 19NW DC LLC 2ND FL STREAM
Building permit — plumbing and gas
Owner: REEP-OFC 1111 19NW DC LLC
Building permit — mechanical
Owner: REEP-OFC 1111 19NW DC LLC
Building permit — electrical
Owner: REEP-OFC 1111 19NW DC LLC
Building permit — plumbing and gas
Owner: REEP-OFC 1111 19NW DC LLC
Building permit — alteration and repair
INTERIOR RENOVATIONS ON 2ND FLOOR FOR NEW CONFERENCE CENTER, FITNESS CENTER AND TWO SPEC SUITES. PARTITIONS, FURNITURE, FIXTURES, FINISHES, MEP, LIFE SAFETY AND STRUCTURAL HANGING MOVABLE PARTITION. SUITE 200: 4834 SF. 133 OCCUPANTS. SUITE 220: 3970 SF. 85 OCCUPANTS. CONFERENCE CENTER: 4929 SF. 218 OCCUPANTS. FITNESS CENTER: 2953 SF. 60 OCCUPANTS.
Applicant: SAM HOLLEN · Owner: REEP-OFC 1111 19NW DC LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.