KENSINGTON, MD, 20895 · Montgomery County
Building permit — building residential permit
� REPAIR EXISTING GARAGE WITH REPLACING DAMAGED WOOD STUDS AS NECESSARY. � NEW INTERIOR PARTITION WALL. � NEW GARAGE DOOR AND NEW 6FT DOUBLE DOOR IN STORAGE AREA. � RECONSTRUCT RIGHT SIDE WALL
Building permit — building residential permit
� REPAIR EXISTING GARAGE WITH REPLACING DAMAGED WOOD STUDS AS NECESSARY. � NEW INTERIOR PARTITION WALL. � NEW GARAGE DOOR AND NEW 6FT DOUBLE DOOR IN STORAGE AREA. � RECONSTRUCT RIGHT SIDE WALL, This is an Accessory Dwelling Unit.
Building permit — building residential permit
CONSTRUCT NEW REAR TWO STORY ADDITION. CONSTRUCT NEW SECOND FLOOR ON EXISTING FIRST FLOOR. NEW FRONT PORCH. NEW STAIRS TO SECOND FLOOR. Customer states 3282 add. Add 2270. Alt 1012sf
Building permit — building residential permit
REPAIR EXISTING GARAGE WITH REPLACING DAMAGED WOOD STUDS AS NECESSARY | NEW INTERIOR PARTITION WALL | NEW GARAGE DOOR AND NEW 6FT DOUBLE DOOR IN STORAGE AREA | DETACHED BUILDING IS NOT ADU
Right-of-way permit — public right of way
Place temporary dumpster within the public right of way. Permittee must. Do not block the access to fire hydrant. Dumpster location, pavement protection (with plywood) and warning devices such as barricades, traffic cones and/or lights are to be placed as directed by the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way including haul route caused by construction. The permittee agrees to hold Montgomery County harmless from any liability associated with placement of dumpster in the public right of way. For parking meter issues.
Right-of-way permit — public right of way
Restoration of ROW/Roadside Tree ProtectionThe existing driveway shall be used for construction access from the street to complete the addition. Materials and equipment are not permitted to be stored within the public right of way or tree protection area. Install tree protection fence per the approved plan to protect the roadside tree throughout construction activity. Restoration shall be made "in-kind" of any damages done to existing improvements and haul routes in the public right-of-way caused by accessing to construction within property. All restoration works in the ROW shall be performed as directed by DPS ROW inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). All lane and sidewalk closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the inspector.
Published by Maryland SDAT as assessment data, separately from the county’s permit record above, and current as of the state’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.