11202 WAYCROSS WAY

KENSINGTON, MD, 20895 · Montgomery County

Permit activity

Apr 2026 → Aug 2026
  1. Right-of-way permit appliedApr 7
  2. Building permit appliedJun 5
  3. Building permit issuedAug 10
MC-1160666
Issued

Building permitbuilding residential permit

The construction of a new single family dwelling Customer states 9000sf.  5962SF house with footprint, Deck 201sf.

Issued Aug 10, 2026
Filed Jun 5, 2026
$250,000
MC-ROW-423494
Open

Right-of-way permitpublic right of way

Stabilized Construction Entrance/Residential Driveway/Roadside Tree PlanThe existing driveway shall be used for construction access from the street to demolish the existing home and construct a new one.  Once construction is complete, replace the driveway apron per the MC-301.05 County Design Standard.  The 26" maple tree located in the public right of way is approved to be removed due to construction impacts. Resulting stump is to be removed.  One 2" caliper silver linden tree shall be planted back into the ROW between the months of October and April.  The two 4" dogwood trees located in the ROW shall be protected as approved by following the limits of disturbance and installing tree protection measures as shown.  All work in the ROW shall be performed as directed by DPS ROW inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG).  The public sidewalk shall remain open/passable and ADA compliant throughout the entirety of construction.  Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way including haul route caused by construction.   All lane and sidewalk closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the inspector.

Filed Apr 7, 2026

Property record

The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.

Montgomery building
current to Sep 22, 2026
Montgomery right of way
current only to May 12, 2026 (feed read Aug 30, 2026)