WASHINGTON, DC 20020 · DC — Ward 8
Building permit — sign
Install (2) non-illuminated building-mounted signs.
Applicant: KEN PADGETT · Owner: DISTRICT OF COLUMBIA HOUSING AUTHORITY
Building permit — mechanical
Owner: DISTRICT OF COLUMBIA HOUSING AUTHORITY
Building permit — electrical
Owner: PRESERVATION OF AFFORDABLE HOUSING, INC.
Building permit — elevator - new
Install two (2) 3500# Gen3 Edge elevators.
Applicant: NICHOL BREVIG · Owner: DISTRICT OF COLUMBIA HOUSING AUTHORITY
Building permit — new building
REVISION # 2 TO B2303645 TO ADDRESS THE FOLLOWING CHANGES: 1. ACCOMMODATIONS HAVE BEEN MADE TO INCLUDE GEOTHERMAL. SCOPE INCLUDES THE ADDITION OF A GEOTHERMAL PUMP ROOM AT P1 GARAGE LEVEL AND FLUID COOLER/GENERATOR AT LEVEL 1. EXHAUST SHAFTS HAVE ALSO BEEN ADDED FROM LEVEL 2 TO THE ROOF TO PROPERLY VENTILATE THE PROPOSED GENERATOR. 2. ADDITIONAL ITEMS REQUESTED BY THE OWNER/STAKEHOLDERS INCLUDE UNDER-SLAB DRAINAGE WITH DEDICATED SUMP PUMP, ELECTRIC VEHICLE AND CHARGING STATION UPDATES, ADDITIONAL RETAIL TRASH ROOM DOOR, AND OTHER MISCELLANEOUS MODIFICATIONS. Revision # 1 under B2402435
Applicant: POAH POAH · Owner: POAH
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.