Building permit — na
Home Office
Applicant: HANEY HADDADIN · Owner: CP VII 1150 FIRST LLC
Building permit — sign
Install five (5) internally illuminated signs for Panera Bread. Two (2) sets of channel letters above the entrances, two (2) window signs hanging on the interior of the windows, and one (1) projecting sign on the corner of the building.
Applicant: PATIENCE SHAFFER · Owner: CP VII 1150 FIRST LLC
Building permit — electrical
Owner: CP VII 1150 FIRST LLC
Building permit — alteration and repair
Repair/ replace some equipment to storefront, equipment, mechanical, plumbing, electrical and energy on existing.
Applicant: INSPECTOR STEVENS · Owner: CP VII 1150 FIRST LLC
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: DAWN NATION
Building permit — mechanical
Owner: CP VII 1150 FIRST LLC
Building permit — plumbing and gas
Owner: CP VII 1150 FIRST LLC
Building permit — electrical
Owner: CP VII 1150 FIRST LLC
Building permit — alteration and repair
Construction of a new demising wall, construction of new interior partition walls, modification of existing storefront/ louvers, modification of existing floor slab, and addition of a new ramp. Interior tenant build-out of existing tenant suite for a PANERA BREAD fast-carry restaurant. Area affected: 3,138 SF
Applicant: INSPECTOR STEVENS · Owner: CP VII 1150 FIRST LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.