WASHINGTON, DC 20004 · DC — Ward 2
Building permit — demolition
HISTORIC Scope includes demolition of interior walls, ceilings, floor finishes, lighting, & excess mechanical ductwork to expose ceilings for design review/analysis.
Applicant: DAVID THOMAS FONTANA · Owner: JEMAL'S SQUARE 320 LLC
Building permit — alteration and repair
HISTORIC Amendment to permit application No.?B2601335. Changes included added inspection space, extension of security corridor and resizing and repositioning of executive meeting room. No revisions to structure or use.
Applicant: OLUFELA PYNE · Owner: JEMAL'S SQUARE 320 LLC
Building permit — electrical
Owner: JEMAL'S SQUARE 320 LLC
Building permit — miscellaneous
HISTORIC 4TH AND 5TH LEVELS PARTIAL FLOOR TENANT IMPROVEMENT INCLUDING: SELECTIVE DEMOLITION AND NEW CONSTRUCTION - PARTITION, MECHANICAL, ELECTRICAL, PLUMBING, CEILING & LIFE SAFETY 17,764 SF
Applicant: WILL RICHEY · Owner: JEMAL'S SQUARE 320 LLC
Building permit — electrical
Owner: JEMAL'S SQUARE 320 LLC
Building permit — electrical
Owner: JEMAL'S SQUARE 320 LLC
Building permit — mechanical
Owner: JEMAL'S SQUARE 320 LLC
Building permit — electrical
Owner: JEMAL'S SQUARE 320 LLC
Building permit — plumbing and gas
Owner: JEMAL'S SQUARE 320 LLC
Building permit — plumbing and gas
Owner: JEMAL'S SQUARE 320 LLC
Building permit — plumbing and gas
Owner: JEMAL'S SQUARE 320 LLC
Building permit — mechanical
Owner: JEMAL'S SQUARE 320 LLC
Building permit — alteration and repair
HISTORIC *NO STRUCTURAL WORK* - 5TH FLOOR PARTIAL FLOOR TENANT IMPROVEMENT (SECURE SPACE) INCLUDING: SELECTIVE DEMOLITION AND NEW CONSTRUCTION - PARTITION, MECHANICAL, ELECTRICAL, PLUMBING, CEILING & LIFE SAFETY
Applicant: OLUFELA PYNE · Owner: JEMAL'S SQUARE 320 LLC
Building permit — electrical
Owner: JEMAL'S SQUARE 320 LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.