WASHINGTON, DC 20002 · DC — Ward 6
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: CHRIS CLARK
Building permit — alteration and repair
Revise an issued permit B2601797 to remove a majority of the Retail 2 demo scope from the initial permit. The existing openings between the Retail space and the Residential use remain in the demo scope. New wall types remain in scope of work to separate the residential and retail use.
Applicant: DAN WILLIAMS
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: CHRIS CLARK
Building permit — alteration and repair
Full project scope: Interior renovation and relocation of the 1st floor leasing offices, lobby concierge desk relocation, fitness studio renovation into a package room, package hub space renovation into a new mail room, conversion of the old leasing office and retail spaces into whitebox retail spaces. MEP scope include new electrical closet, new mechanical system for leasing, and demo of the old leasing and retail spaces.
Applicant: DAN WILLIAMS · Owner: DC FIRST AND M OWNER LLC
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.