ROCKVILLE, MD, 20852 · Montgomery County
Building permit — commercial building
FENCE OF 60 LINEAR FEET.
Right-of-way permit — public right of way
Place underground conduit by trenching, install splice boxes, and pull cable to energize street lights and remove 3 existing overhead lights in accordance with PEPCO WO# 20756073 plan. Pepco to Install Conduit, Splice Boxes, Cabling to Energize 13-55W UG LED Street Lights. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way, including haul route, caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site. Parking Meters: The permittee shall. Meter numbers and location must be specified.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.