WASHINGTON, DC 20036 · DC — Ward 2
Building permit — electrical
Owner: DIV DC MULTI LLC
Building permit — elevator - new
HISTORIC New install 4000# traction elevator, N1KT54
Applicant: NICHOL BREVIG · Owner: DIV SC MULTI, LLC
Building permit — electrical
Owner: DIV DC MULTI LLC
Building permit — plumbing and gas
Owner: DIV DC MULTI LLC
Building permit — mechanical
Owner: DIV DC MULTI LLC
Building permit — plumbing and gas
Owner: DIV DC MULTI LLC
Building permit — electrical
Owner: DIV DC MULTI LLC
Building permit — alteration and repair
Revision to Permit # B2507306 to update Lot Number from 0810 to 0079.
Applicant: DFM PERMITS · Owner: DIV DC MULTI LLC
Building permit — alteration and repair
Convert the existing 12-story + penthouse office building to an apartment building (166 units). Transform the mechanical and storage rooms in the basement and penthouse levels into amenity spaces. Area affected by work: 202,813 SF DOEE #8296
Applicant: DFM PERMITS · Owner: DIV DC MULTI, LLC
Building permit — variance
APR program B2507306 2017 DCMR section 705.8.7 At-risk openings allowed 15 feet or less from adjacent structures or premises. Exemption 2. Openings allowed pursuant to this section shall not be counted towards requirements of the Construction Codes for emergency egress, natural light, natural ventilation, or smoke control. The proposed no build easement assures no construction within 15 feet of our North exterior wall. Based on this fire separation distance (table 705.8) the North elevation could have 75% windows however only 17.9% are proposed. Attached please see our North elevation.
Applicant: MELISSA DIAZ
Building permit — plumbing and gas
Owner: DIV DC MULTI LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.