WASHINGTON, DC 20002 · DC — Ward 6
Building permit — plumbing and gas
Owner: EGP 1200 WASHINGTON LLC
Building permit — plumbing and gas
Owner: EGP 1200 WASHINGTON LLC
Building permit — plumbing and gas
Owner: EGP 1200 WASHINGTON LLC
Building permit — electrical
Electrical Trade Permit
Applicant: ERIK ANTHONY · Owner: EGP 1200 WASHINGTON LLC
Building permit — alteration and repair
NO STRUCTURAL WORK/ALTERATION. SCOPE OF WORK INCLUDES LEVEL 2 ALERATION OF TENANT SPACE ONLY (NEW INTERIOR PARTITIONS, CEILING, MECHANICAL, LIGHTING, AND FIRE ALARM DEVICES). EXISTING BUILDING EGRESS & FIRE RATING NOT CHANGED. TOTAL SQUARE FOOTAGE AFFECTED FIRST, THIRD, & FIFTH TO TWELFTH FLOORS: IS 70,049 SQ. FT. REFER TO CODE ANALYSIS SHEETS 0002 0011 FOR SQUARE FOOTAGE BREAKDOWN BY FLOOR. REMAINING AREA OF WORK SHOWN FOR REFERENCE ONLY, PERMIT NOT REQUIRED FOR PAINT & CARPET SCOPE.
Applicant: ANDREW ADERE · Owner: EGP 1200 WASHINGTON LLC
Building permit — alteration and repair
SCOPE OF WORK INCLUDES IMPROVEMENT OF TENANT SPACE ONLY (RECONFIGURATION OF EXISTING OFFICES AND CONVERSION OF AN EXISTING STORAGE ROOM INTO A NEW CONFERENCE ROOM). EXISTING FIRE RATING NOT CHANGED AREA OF WORK IS 768 SQ.FT. THIS IS A LEVEL 2 ALTERATION. NO STRUCTURAL WORK/ALTERATION.
Applicant: ANDREW ADERE · Owner: EGP 1200 WASHINGTON LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.