WASHINGTON, DC 20010 · DC — Ward 1
Building permit — addition alteration repair
The interior of the rowhouse is being demolished and gutted. Front Porch, Front Steps, Front Wall, and Party Walls are repaired. Rear Wall and existing addition is demolished and will be replaced with new rear wall and addition (described later). Roof is demolished and will be replaced with new roof. Both Party Walls and Front Wall will be underpinned. Basement is excavated to attain a new Basement height of at least 8 ft. New stairs in front will provide access to Basement. Basement will become legal rental unit. Interior is rebuilt with new joists and framing. New Bathrooms and new Kitchen will be installed per plan. Windows on front elevation will be replaced. New windows and doors on Rear Elevation. Rear Addition is described below. UNDERPINNING
Applicant: SASSAN KIMIAVI; SASSAN KIMIAVI · Owner: ALEXANDER S KIMIAVI TRUSTEE
Building permit — demolition
We are demolishing a number of partition walls and removing hardwood floors, old kitchen cabinets, old vanities, and old plumbing fixtures. These are shown on the demolition plan.
Applicant: SASSAN KIMIAVI; SASSAN KIMIAVI · Owner: ALEXANDER S KIMIAVI TRUSTEE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.