WASHINGTON, DC 20002 · DC — Ward 6
Building permit — mechanical
Owner: TRAN, SPENCER M
Building permit — alteration and repair
Remove existing roof on main roof down to wood deck, any rotten wood Furnish and install a 1 inch layer of ISO insulation to cover entire roof deck using screws and plates to secure to roof.Furnish and install a mechanically attached GAF.060 white TPO, secure to insulation.Furnish and install all flashing and counter flashings to provide a water tight roofing system, heat welded and fused together.Furnish and install a 12 inch TPO base flashing, heat welded along parapet walls.Furnish and install a TPO drip edge primed, heat welded and integrated into roofing system.Clean and remove all debris from job. Use nail magnets throughout yard and driveway.
Applicant: TRAN, SPENCER M · Owner: VO, CATHERINE A
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.