WASHINGTON, DC 20003 · DC — Ward 6
Building permit — alteration and repair
HISTORIC Remove existing windows, leave framing in place, clean frame and service window frame, install new pocket windows. Located in the front of the building.
Applicant: FAY, CHRISTIAN J · Owner: FAY-LUKIC, JELENA
Building permit — alteration and repair
Remove existing kitchen windown. Remove brick work to accomdate new french door that will replace the kitchen windown. Make any related repairs. Install new steel lintel to replace current wooden windown. Seal and waterproof door as required.
Applicant: FAY, CHRISTIAN J · Owner: FAY-LUKIC, JELENA
Building permit — alteration and repair
In the Capitol Hill Historic District Escavate and grape back yard. Make any related repoint repairs if discovered. Lay 4 gravel, add reenforcment wire, pour 4 inches 4,000 PSI cement, install expansion joints, and broom finish.
Applicant: FAY, CHRISTIAN J · Owner: FAY-LUKIC, JELENA
Building permit — alteration and repair
In the Capitol Hill Historic District Remove old windows. Service brick opening. Install new lintal. Install new window. Install related molding. Paint
Applicant: FAY, CHRISTIAN J · Owner: FAY-LUKIC, JELENA
Building permit — alteration and repair
HISTORIC Replace 3 existing windows with new wood framed windows. Remove old windows, service masonary work, replace lintel with new, install new windows to match and comply with historice requirement.
Applicant: FAY, CHRISTIAN J · Owner: FAY-LUKIC, JELENA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.