WASHINGTON, DC 20017 · DC — Ward 5
Building permit — electrical
Owner: TRINITY COLLEGE
Building permit — alteration and repair
ALUMNAE HALL RENOVATION PERMIT REVISION OF B2601758 TO ADDRESS PREVIOUSLY UNKNOWN STRUCTURAL REPAIRS TO EXISTING CONCRETE CONDITIONS
Applicant: DAVID CUNNINGHAM · Owner: TRINITY COLLEGE
Building permit — plumbing and gas
Owner: TRINITY COLLEGE
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: CHARLES CHISLEY · Owner: TRINITY COLLEGE
Building permit — mechanical
Mechanical trade Permit
Applicant: CHARLES CHISLEY · Owner: TRINITY COLLEGE
Building permit — alteration and repair
Alumnae Hall Renovation - Provide new fire suppression, HVAC upgrades, plumbing replacement, dorm bathroom upgrades, elevator replacement + 1 new elevator, large-scale kitchen upgrades, window replacement, and a new accessible entrance ramp to the building. Area affected: 48,712 SF
Applicant: DAVID CUNNINGHAM; CLARK CONSTRUCTION GROUP LLC. · Owner: TRINITY COLLEGE
Building permit — demolition
Removal of all existing windows, existing exterior wood framed ramp, and exterior ground level and roof top kitchen equipment. Removal of all interior mechanical equipment and associated conduit, piping and ductwork. Removal of selected electrical panel boards, fixtures and conduit. Removal of existing service and passenger elevator and associated equipment. Removal of existing radiators, plumbing risers, piping, fixtures and accessories, and selected sanitary lines. Removal of all kitchen equipment and associated servery / dining stations. Removal of selected non-bearing wall partitions, acoustical tile ceilings, doors and associated hardware.
Applicant: DAVID CUNNINGHAM · Owner: TRINITY COLLEGE
Building permit — variance
2014 NFPA 70 National Electrical Code (NEC), Article 110.26(A)(1) Working Space About Electrical Equipment BUILDING PERMIT B2509404
Applicant: DAVID CUNNINGHAM · Owner: TRINITY COLLEGE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.