GERMANTOWN, MD, 20876 · Montgomery County
Building permit — commercial building
Interior work only,Foundation and footing replacement and repair for historic agricultural building.
Right-of-way permit — public right of way
Abandon gas service in accordance with Washington Gas permit No. 1068066. ABANDON SERVICE. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. All adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way, including haul route, caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site.ROW Trees: If right-of-way trees are removed or impacted as determined by the DPS ROW inspector/certified tree arborist due to construction under this permit, a Maryland DNR Roadside Permit must be obtained.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.