WASHINGTON, DC 20017 · DC — Ward 5
Building permit — permit
Building permit — alteration and repair
This submission is intended to accompany a minor plan revision to the above-referenced permit.The purpose of this revision is to document the relocation of the basement utility room. The revision reflects as-built conditions and is limited in scope to the cellar level only. There is no change to use, occupancy, equipment type, system capacity, or structural elements associated with this project.All work remains in compliance with the originally approved permit and applicable codes. This submission is provided to ensure alignment between the approved construction documents and the work performed prior to scheduling final inspections.
Applicant: SAM KLAIMI · Owner: WHEATLEY, LORENZ A
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.