WASHINGTON, DC 20001 · DC — Ward 2
Building permit — alteration and repair
REVISION TO APPROVED PERMIT B2502991 TO CHANGE THE SIZING OF A STRUCTURAL BEAM DUE TO SITE CONDITIONS AND UPDATE THE FOOTING DETAILS ON THE FOUNDATION PLAN TO MATCH SITE CONIDITIONS. DUE TO DETERIORATION OF THE SOUTH BRICK (NON-PARTY) WALL, A 25 FOOT SECTION OF THAT WALL IS NOW PROPOSED TO BE BUILT NEW RATHER THAN REUSED. NO CHANGE TO FOOTPRINT, FLOOR PLANS LAYOUT, OR ELEVATIONS. ORIGINAL SCOPE OF B2502991: PROPOSED LEVEL 03 ADDITION TO AN EXISTING 4 UNIT ROW BUILDING.
Applicant: ERIC F TERAN · Owner: KHAN, YASMIN
Building permit — addition alteration repair
PROPOSED LEVEL 03 ADDITION TO AN EXISTING 4 UNIT ROW BUILDING.
Applicant: ERIC F TERAN · Owner: KHAN, YASMIN
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.