WASHINGTON, DC 20002 · DC — Ward 5
Building permit — alteration and repair
REVISION TO BUILIDNG PERMIT B2601245: REVISION TO INTERIOR STEPS AND REAR EXISTING REAR ADDTION DUE TO ROT AND DECAY.
Applicant: OLIVIA AKINSAN · Owner: CAMPOS, JUAN F
Building permit — alteration and repair
REVISION TO PERMIT B2601245: ADDRESS STRUCTURAL DISTRESS OF EXISTING FOUNDATION WALL, BEING IMPACTED BY LATERAL LOAD FROM EXISTING FRONT PORCH. WORK TO OCCUR ON FRONT PORCH. OTHER REVISIONS INCLUDE INTERIOR REVISIONS TO LAYOUTS ON CELLAR, 1ST AND 2ND FLOOR
Applicant: OLIVIA AKINSAN · Owner: CAMPOS, JUAN F
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: CAMPOS, JUAN F · Owner: CAMPOS, JUAN F
Building permit — electrical
Owner: CAMPOS, JUAN F
Building permit — mechanical
Owner: JUAN CAMPOS
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: WILBERT CRUZ JIMENEZ
Building permit — alteration and repair
DEMOLITION ALTERATION AND REPAIR WITH PROPOSED REAR DECK. UPGRADE M.E.P'S.
Applicant: OLIVIA AKINSAN · Owner: BRADLEY, ALPHOZO D
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.