WASHINGTON, DC 20020 · DC — Ward 6
Building permit — alteration and repair
HISTORIC This is a revision to permits B2301371 and B2410312 to include MEP and facade revisions. A detailed narrative of all changes are included in Supporting Documentation.
Applicant: COMAN ILAHI · Owner: HOPE VIEW APARTMENTS LP
Building permit — plumbing and gas
Owner: HOPE VIEW APARTMENTS LP
Building permit — electrical
Owner: HOPE VIEW APARTMENTS LP
Building permit — solar system
HISTORIC NEW SOLAR PV SYSTEM: 31.98 kWDC, 27.30 kWAC HOPE VIEW APARTMENT
Applicant: TAREK G AZAR · Owner: HOPE VIEW APARTMENTS LP
Building permit — electrical
Electrical Trade Permit
Applicant: RAMIRO FERNANDEZ · Owner: HOPE VIEW APARTMENTS LP
Building permit — plumbing and gas
Owner: HOPE VIEW APARTMENTS LP
Building permit — electrical
Electrical Trade Permit
Applicant: RAMIRO FERNANDEZ · Owner: HOPE VIEW APARTMENTS LP
Building permit — electrical
Electrical Trade Permit
Applicant: STEPHANOS RODOUSAKIS · Owner: HOPE VIEW APARTMENTS LP
Building permit — plumbing and gas
Owner: HOPE VIEW APARTMENTS LP
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: CHRIS CLARK · Owner: HOPE VIEW APARTMENTS LP
Building permit — mechanical
Owner: RECOVERY CAFE DC
Building permit — tenant layout
In the Anacostia Historic District Tenant layout of new space for office and meeting rooms for private non-profit. Space will contain a small commercial kitchen that will prepare meals for the non-profit members. Includes new pre-fabricated entrance canopy.
Applicant: NATE AKEY · Owner: RECOVERY CAFE DC
Building permit — elevator - new
Install 1 new traction elevator Capacity 3500lbs Speed 150FPM
Applicant: INSPECTOR STEVENS · Owner: HOPE VIEW APARTMENTS LP
Building permit — electrical
Electrical Trade Permit
Applicant: FREDERICK PETRUS · Owner: HOPE VIEW APARTMENTS LP
Building permit — electrical
Owner: HOPE VIEW APARTMENTS LP
Building permit — mechanical
Owner: HOPE VIEW APARTMENTS LP
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.