ROCKVILLE, MD, 20853 · Montgomery County
Building permit — building residential permit
Interior alteration of garage: upgrade existing electrical and add plumbing for home salon. No structural changes. A separate Home Occupation Certificate will be needed for the proposed use. This permit is for construction/building only.
Building permit — commercial building
Interior work only,Interior alteration: converting existing attached garage (~200 SF) into a one-station nail salon with plumbing, ventilation, and electrical upgrades.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.