Building permit — addition alteration repair
THE PROJECT INVOLVES (1) CONSTRUCTING A PATH CONNECTING THE SOUTH DECK TO A THREE-SIDED GAZEBO, AND (2) INSTALLING BAR RAILING ALONG EXISTING TERRACE. FOR THE GAZEBO, DRAWINGS ARE PROVIDED FOR THE CUSTOM GAZEBO INCLUDING FOUNDATIONS, VERTICAL AND HORIZONTAL MEMBERS, AND A BENCH. THE GAZEBO ROOF WILL HOUSE SOLAR PANELS TO POWER OUTDOOR LIGHTING, AND EXTERIOR GRADE POWER RECEPTACLES WILL BE PROVIDED. FOR TERRACE IMPROVEMENT, DRAWINGS ARE PROVIDED FOR BAR RAILING AND FIXED CHAIRS AND REMOVABLE UMBRELLAS ON THE TERRACE, WITH LINEAR LIGHT FIXTURE AND EXTERIOR GRADE POWER RECEPTACLES TO THE RAILING. LIGHTING WILL BE INSTALLED FOR THE BAR RAILING AND INSIDE GAZEBO. For DOB Application Admin Use: Existing headquarters building area is 34,191 SF per zoning application (2015), and the proposed gazebo is 288 SF, as a reference to the question: Present gross floor area of the building: 34,191 SF; Proposed gross floor area of the building: 34,479 SF. The proposed work includes a new detached gazebo. The existing main building is a 6-story structure, and no changes are being made to its number of stories. Therefore, the Proposed Number of Stories of the Building remains 6. 911 address: 1385 CANAL ST SE, WASHINGTON, DC 20003-5015
Applicant: HUI CHEN · Owner: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY
Building permit — alteration and repair
REPLACE THE EXISTING FIRE ALARM DIALER WITH NEW DIALER.
Applicant: BILL SAUNDERS · Owner: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY
Building permit — electrical
Owner: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY
Building permit — alteration and repair
THE PROJECT INVOLVES CONSTRUCTING A TURNSTYLE AND ADA GATE IN THE EXISTING WALL TO PROVIDE ACCESS TO YARDS PARK INCLUDING THE ADA RAMP NECESSARY TO ACCESS THE GATES. ELECTRICAL WORK INCLUDES RELOCATION OF EXISTING CONDUITS LOCATED ON THE FACE OF THE EXISTING WALL TO MAKE WAY FOR THE ADA RAMP AND GATES. ADDITIONALLY CONDUIT WILL BE PROVIDED FOR CARD READERS FOR BOTH GATES. STRUCTURAL DRAWINGS FOR THE RAMP AND FOUNDATIONS ARE ALSO PART OF THE SCOPE. For DOB Admin Use: The 911 address for this project is Water Street SE (The Yards Park Great Lawn).
Applicant: HUI CHEN · Owner: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY
Building permit — electrical
Owner: DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.