WASHINGTON, DC 20005 · DC — Ward 2
Building permit — miscellaneous
AFTER HOURS WORK PERMIT IN CONJUNCTION WITH B2602789, 11TH FLOOR OFFICE RENOVATION. 5AM TO 7AM. MONDAY THROUGH FRIDAY, PER ANC APPROVAL.
Applicant: SAM HOLLEN · Owner: ZG 1400 EYE, LLC
Building permit — electrical
Owner: ZG 1400 EYE, LLC
Building permit — plumbing and gas
Owner: ZG 1400 EYE, LLC
Building permit — plumbing and gas
Owner: ZG 1400 EYE, LLC
Building permit — plumbing and gas
Owner: ZG 1400 EYE, LLC
Building permit — miscellaneous
AFTER HOURS WORK PERMIT IN CONJUNCTION WITH B2602789, 11TH FLOOR OFFICE RENOVATION. 5AM TO 7AM. MONDAY THROUGH FRIDAY. 5AM TO 1PM ON JULY 3, 2026, INDEPENDENCE DAY HOLIDAY, PER ANC APPROVAL.
Applicant: SAM HOLLEN · Owner: ZG 1400 EYE, LLC
Building permit — electrical
Owner: ZG 1400 EYE, LLC
Building permit — electrical
Owner: ZG 1400 EYE, LLC
Building permit — electrical
Owner: ZG 1400 EYE, LLC 11TH FLOOR CTFK
Building permit — alteration and repair
11TH FLOOR (SUITE 1200) RENOVATION PROJECT CONSISTS OF INTERIOR - ONLY RENOVATION TO CREATE SINGLE TENANT SUITE. RENOVATIONS WITHIN THE EXISTING CTFK TENANT FOOTPRINT WILL INCLUDE RECONFIGURATION OF THREE OPEN AREAS TO CREATE ENCLOSED ROOMS, THE ADDITION OF A GENDER-NEUTRAL ADA TOILET ROOM, AND CONNECTION TO THE EXPANSION SPACE. THE EXPANSION AREA WILL BE DEMOLISHED AND REBUILT TO PROVIDE CONFERENCING AND PANTRY FACILITIES, ALONG WITH ADDITIONAL OPEN OFFICE WORK SPACE. 3712 SF AFFECTED AREA. NO CHANGE OF USE.
Applicant: OLUFELA PYNE · Owner: ZG 1400 EYE, LLC
Building permit — alteration and repair
**NO STRUCTURAL WORK** 12TH FLOOR RENOVATION PROJECT CONSISTS OF INTERIOR-ONLY, NONSTRUCTURAL RENOVATION WITHIN EXISTING OFFICE FULL FLOOR SUITE. ALTERATION LEVEL 2 UNDER IEBC. RENOVATIONS WILL DIVIDE TWO EXISTING OFFICES, AND ENCLOSE/MODIFY FOUR OPEN WORK AREAS FOR SOUND PRIVACY. 1940 SQUARE FEET AFFECTED AREA.
Applicant: OLUFELA PYNE · Owner: ZG 1400 EYE, LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.