WASHINGTON, DC 20010 · DC — Ward 1
Building permit — addition alteration repair
The revision is to modify the plan to reflect the layout accuracy and exterior addition over existing permit B2407297, which is to finish up the final inspection that was left over from the previous permit B1303301 in 2013. The construction from B1303301 finished the rough-in inspection, but not final inspection. The revision includes those items. 1) Plan modification highlighted with cloud on page A.1, A.2, E.1, M1, P.1.2) The security screen for the front basement airway highlighted on page A.4.
Applicant: GUANGMIN (MICHELLE) PU · Owner: WISTER, LEE
Building permit — electrical
Owner: WISTER, LEE
Building permit — deck
REVISION TO B2407297 Rearrage AC unit location, then build a new deck as shown on page A.6, A.7, and A.8.
Applicant: GUANGMIN (MICHELLE) PU · Owner: WISTER, LEE
Building permit — plumbing and gas
Owner: WISTER, LEE
Building permit — mechanical
Owner: WISTER, LEE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.