WASHINGTON, DC 20007 · DC — Ward 2
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: EDSON FAMILY FIRE SERVICES LLC · Owner: LSVA XXIII LLC
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: EDSON FAMILY FIRE SERVICES LLC · Owner: LSVA XXIII LLC
Building permit — alteration and repair
CFA/OGB PROJECT WORK INCLUDES INTERIOR ONLY BUILD-OUT FOR A NEW A-2 RESTAURANT FROM BANK -B. THE SCOPE OF WORK INCLUDES NEW INTERIOR NON-STRUCTURAL PARTITIONS, FINISHES, LIGHTING, AND SEATING. NEW EQUIPMENT INCLUDES A SERVICE COUNTER, PREP & COOKING AREA, FRESH FRUIT STATION FOR PREPPING AND PRESSING FOR JUICE, AND WAREWASHING EQUIPMENT. NEW ELECTRICAL, MECHANICAL AND PLUMBING FOR THE LAYOUT. NEW REAR EGRESS STAIR AND EXTERIOR DOOR WITH ASSOCIATED STRUCTURAL SUPPORT FOR STAIR AND FLOOR CONSTRUCTION. AREA AFFECTED BY THE WORK 3,239 SF FIRE ALARM AND FIRE SPRINKLER MODIFICATIONS AS REQUIRED TO SUPPORT NEW LAYOUT WILL BE SUBMITTED SEPARATELY BY INSTALLER. ALL EXTERIOR SIGNAGE INDICATED IN THIS PACKAGE IS FOR INFORMATIONAL PURPOSES ONLY AND REQUIRES A SEPARATE PERMIT.
Applicant: PAULA MEJIA · Owner: 1420 WISCONSIN HOLDINGS LLC
Building permit — alteration and repair
In the Georgetown Historic District In the Commission of Fine Arts jurisdiction area 1. REMOVAL OF AN EXISTING REAR DOOR AND MODIFICATION OF THE OPENING TO CREATE A CASE OPENING FOR A NEW ENCLOSED VESTIBULE, INCLUDING ASSOCIATED LIMITED STRUCTURAL WORK AS REQUIRED. 2. CONSTRUCTION OF A NEW REAR VESTIBULE INCLUDING NEW WALLS AND A NEW EXIT DOOR TO PROVIDE A COMPLIANT SECOND MEANS OF EGRESS. 3. REPLACEMENT OF EXISTING REAR GROUND FLOOR WINDOWS IN KIND. 4. INFILL OF EXISTING REAR BASEMENT WINDOW OPENINGS WITH MATCHING MATERIALS AND CONSTRUCTION. 5. LIMITED FRONT ELEVATION WORK CONSISTING OF SELECTIVE PAINTING OF FACADE ACCENT AREAS, AND ASSOCIATED ELECTRICAL FOR PROPOSED LIGHTING TO BE PROVIDED UNDER A SEPARATE PERMIT. SIGNAGE AND LIGHTING TO BE PROVIDED UNDER SEPARATE PERMIT SHOWN IN SET FOR REFERENCE ONLY. ALL OTHER AREAS OF THE BUILDING SHALL REMAIN UNCHANGED. STRUCTURAL AND ELECTRICAL WORK IS LIMITED TO THE ITEMS SPECIFICALLY DESCRIBED HEREIN. NO MECHANICAL OR PLUMBING WORK. NO BUILDING ADDITION OR CHANGE IN USE.
Applicant: PAULA MEJIA · Owner: 1420 WISCONSIN HOLDINGS LLC
Building permit — electrical
Owner: 1420 WISCONSIN HOLDINGS LLC
Building permit — mechanical
Owner: 1420 WISCONSIN HOLDINGS LLC
Building permit — plumbing and gas
Owner: 1420 WISCONSIN HOLDINGS LLC
Building permit — alteration and repair
CFA / H ALTERATION LEVEL 3 EXTERIOR ENVELOPE: STOREFRONT DOOR AND WINDOW ON THE FRONT FACADE OF FIRST FLOOR. 1ST FLOOR: PROVIDE DEEPER RECESS AT ENTR. REPLACE STOREFRONT. STAIR, LOBBY STAIR TO 2ND FL & CELLAR. RECONFIGURE STL COL. AT FRONT 2ND FLOOR: INTERIOR ALTERATION PROPOSED FOR FOUR RESIDENTIAL UNITS. CELLAR: PROVIDE METAL COLUMNS TO REINFORCE 1ST & 2ND FLOOR FRAMING.
Applicant: NNEKA SHELTON · Owner: 1420 WISCONSIN HOLDINGS LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.