WASHINGTON, DC 20011 · DC — Ward 4
Building permit — alteration and repair
IN BASEMENT: CONVERT EXISTING WINDOW OPENING INTO ENTRY DOOR MANTEINING THE EXISTING WIDTH.
Applicant: JUAN P GARZON GARCES · Owner: GREEN, ANTOINETTE
Building permit — mechanical
Mechanical trade Permit
Applicant: GUILLERMO BARRAL · Owner: GREEN, ANTOINETTE
Building permit — electrical
Owner: GREEN, ANTOINETTE
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: KEYT DAVIS · Owner: GREEN, ANTOINETTE
Building permit — alteration and repair
HISTORIC INTERIOR ALTERATIONS TO AN EXISTING SFD. BASEMENT: ADD NEW BEDROOM, LAUNDRY AND DEN, EXTEND EXISTING BATHROOM. 1ST FLOOR: REMODEL EXISTING KITCHEN, ADD NEW POWDER ROOM. 2ND FLOOR: ADD TWO NEW BEDROOMS, TWO BATHROOMS AND LAUNDRY.
Applicant: JUAN P GARZON GARCES · Owner: GREEN, ANTOINETTE
Building permit — building
Applicant: ROBERT HARRIS · Owner: ROBERT HARRIS
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: BRYCE CARRINGTON · Owner: MAMIE T POWE LIFE ESTATE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.