WASHINGTON, DC 20017 · DC — Ward 5
Building permit — fence
On the left side, Nail Up, finished side facing outwards, Horizontal Side by Side, Flat Top Cedar Pickets, including a 5-foot-wide gateWe are requesting the permit again because the owner needs the fence to be a 7-foot-tall fence and the approved was a 6.6-foot-tall fence
Applicant: JIAUYE HE · Owner: RODTS, SELENA
Building permit — fence
It is going to be replace the front left fence of the backyard
Applicant: JIAUYE HE · Owner: RODTS, SELENA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.