All permits

14500 MONTEVIDEO RD

POOLESVILLE, MD, 20837 · Montgomery County

Permit activity

Nov 2025 → Aug 2026
  1. Well permit appliedNov 13
  2. Well permit issuedMar 19
  3. Well permit appliedJul 8
  4. Building permit appliedJul 9
  5. Well permit issuedAug 19
MC-WELL-1164163
Issued

Well permitcounty well permit

This permit is for 2 closed loop geothermal well(s). See site plan for location(s). The Department of Permitting Services must be notified 24 hours before construction of well(s). The driller must notify any municipality for wells within that municipality or within one mile of its boundary. Well(s) to be sealed according to COMAR 26.04.04 standards and grouted from the bottom up in one continuous operation. Well(s) must be 10 feet from all underground utilities, storm water pipes,easements and right of ways and 50 feet from storm water structures. A mechanical permit is required to erect, install, enlarge,alter repair, remove, convert or replace a mechanical heating, ventilating and air conditioning system. It is recommended that the property owner record a drawing of all buried pipe locations and depths associated with the geothermal heating andcooling system. The property owner and the licensed driller have the responsibility to comply with

Issued Aug 19, 2026
Filed Jul 8, 2026
MC-1164317
Open

Building permitbuilding residential permit

Construct new single-family home on Lot 1 Montevideo, Plat No. 23859

Filed Jul 9, 2026
$700,000
MC-WELL-1140794
Issued

Well permitcounty well permit

Well to be surveyed by a licensed surveyor as per COMCOR Chapter 27A. Any location change from theprimary well site must have WRITTEN approval by this department PRIOR to drilling. Well to be at least 100 feet from any septic system. Well to be pre-drilled and log submitted to this office prior to issuance of buildingpermit. Septic System Permit application required prior to issuance of building permit. House must be a minimum of 30feet from approved well site(s). All well sites must be 10 ft from driveways and property lines. Sand mound must be staked with orange protective fencing prior to the start of drilling. This must be verified by area field inspector.

Issued Mar 19, 2026
Filed Nov 13, 2025

Property record

The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.

Montgomery building
current to Sep 23, 2026
Montgomery well
current to Sep 17, 2026
Montgomery right of way
current only to May 12, 2026 (feed read Aug 30, 2026)