WASHINGTON, DC 20010 · DC — Ward 1
Building permit — plumbing and gas
Owner: BARBARA CHAMBERS CHILDRENS CENTER
Building permit — electrical
Owner: BARBARA CHAMBERS CHILDRENS CENTER
Building permit — plumbing and gas
Owner: BARBARA CHAMBERS CHILDRENS CENTER
Building permit — alteration and repair
Interior renovation of the kitchen located in the basement. A below grade areaway will be constructed in the courtyard to provide space for a new outdoor walk-in cooler. The existing exterior ramp and stair in the courtyard will be reconfigured to accomdoate the areaway and new equipment.
Applicant: OLUFELA PYNE · Owner: BARBARA CHAMBERS CHILDRENS CENTER
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.