WASHINGTON, DC 20009 · DC — Ward 2
Building permit — alteration and repair
HISTORIC Revision to Permit #B2507428. Revised Scope of Work is as follows:? UNDERPIN REAR ADDITION FOUNDATION WALL? UNDERPIN BASEMENT FOUNDATION WALLS TO LOWER FLOOR.? REMOVE EXISTING BASEMENT CEILING BEAM AND PIERS AND REPLACE WITH A NEW BEAM.-Interior Drain Tile System
Applicant: CHARLES LEVINE · Owner: TAJUDDIN, ZEHRA
Building permit — alteration and repair
Historic District INSTALL HELICAL PIERS ALONG REAR ONE LEVEL WALL.? UNDERPIN BASEMENT FOUNDATION WALLS TO LOWER FLOOR.? REMOVE EXISTING BASEMENT CEILING BEAM AND PIERS ANDREPLACE WITH A NEW BEAM-INTERIOR DRAIN TILE SYSTEM
Applicant: CHARLES LEVINE · Owner: TAJUDDIN, ZEHRA
Building permit — plumbing and gas
Owner: TAJUDDIN, ZEHRA
Building permit — alteration and repair
BASEMENT: NO CHANGE FIRST FLOOR: Expanding bathroom SECOND FLOOR: adding bathroom between Primary bedroom and bedroom remove existing en-suite bathroom in the master bedroom upgrade receptacles and panel board
Applicant: WISAM RABEEA · Owner: TAJUDDIN, ZEHRA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.