1560 TONDORF RD NW

WASHINGTON, DC 20057 · DC — Ward 2

Permit activity

Jan 2026 → Oct 2026
  1. Building permit issuedJan 20
  2. Building permit issuedMar 5
  3. Building permit issuedMar 17
  4. Building permit issuedMar 25
  5. Building permit issuedOct 30
DC-P2505399-EXT-2
PERMIT ISSUED

Building permit — permit

Issued Oct 30, 2026
DC-P2505399-EXT-1
PERMIT ISSUED

Building permit — permit

Issued Mar 25, 2026
DC-B2603185
PERMIT ISSUED

Building permit — alteration and repair

Additional repair work to existing permit B2509038 REMOVE THE CORROSION ON THE STEEL FRAMING MEMBERS ABOVE AND BELOW THE BEARING PLATES AT THE NORTHWEST AND SOUTHWEST CORNERS BENEATH THE BRIDGE. INSTALL SUPPLEMENTAL STEEL TO WEB AND STIFFENER. REMOVE AND REPLACE THE BEARING PLATES/POT BEARINGS; THIS WILL REQUIRE TEMPORARY JACKING UP OF THE STEEL GIRDERS. REMOVE BRICK MASONRY SURROUNDING EXISTING CORBEL TO ALLOW ENGINEER TO REVIEW CONDITION OF CORBEL. COMPLETE ANY NECESSARY REPAIRS TO THE CORBEL AT THE DIRECTION OF ENGINEER PRIOR TO REINSTALLING BRICK MASONRY AT PIER.

Applicant: SHON THOMAS · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY

Issued Mar 17, 2026
DC-EA2600837
PERMIT ISSUED

Building permit — elevator - alteration

Modernize 2 traction elevators in the Leavey Center Building- new motors, new cab interior, new controller, new door equipment, new fixtures & other minor associated elevator equipment.

Applicant: N / A · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY

Issued Mar 5, 2026
DC-EA2600433
PERMIT ISSUED

Building permit — elevator - alteration

Modernize 2 traction elevators in the Leavey Center Building- new machines, new cab interior, new controller, new door equipment, new fixtures & other minor associated elevator equipment.

Applicant: PHYLLIS STEVENS; APS INSPECTIONS · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY

Issued Jan 20, 2026

Property record

SSL 1321 0833
Lot
3,365,395 sq ft
Assessed
$428,743,350
Land / improvements
$249,207,500 / $179,535,850

Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.

DC building
current only to Nov 2, 2026 (feed read Nov 8, 2026)