WASHINGTON, DC 20062 · DC — Ward 2
Building permit — alteration and repair
Historic (Lafayette Square District) and CFA, FEDERAL, - Replacement of (2) Main Switchgear Cabinets and Feeders
Applicant: JD BERKELEY · Owner: CHAMBER OF COMMERCE OF THE USA
Building permit — boiler
Owner: CHAMBER OF COMMERCE OF THE USA
Building permit — alteration and repair
Removal and replacement of boilers and associated piping and controls. Area affected by the work: 420 SF Lafayette HD/ CFA
Applicant: DFM PERMITS · Owner: CHAMBER OF COMMERCE OF THE USA
Building permit — electrical
Owner: CHAMBER OF COMMERCE OF THE USA
Building permit — electrical
Owner: CHAMBER OF COMMERCE OF THE USA
Building permit — mechanical
Owner: CHAMBER OF COMMERCE OF THE USA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.