WASHINGTON, DC 20006 · DC — Ward 2
Building permit — elevator - alteration
Repair/replace the following for a modernization of elevators to include fixture, control, and associated building work
Applicant: INSPECTOR STEVENS · Owner: ZG 1625 K STREET LLC
Building permit — alteration and repair
Interior work only, repair/replace the following: replace switch disconnects for elevator mainline power, fireproof openings and voids in elevator room and hoistways, replace machine room door with new fire rated door, frame, and code compliant hardware, upgrade the electrical equipment in elevator equipment spaces, upgrade lighting in elevator equipment spaces, new or modified pit access ladders, new stand-alone elevator supervisory control unit (ESCU) for elevator recall only, provide standby power to elevator equipment, provide emergency power to light fixtures in elevator spaces, provide new 9000 gph sump pump
Applicant: GREG SABO · Owner: ZG 1625 K STREET LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.