WASHINGTON, DC 20007 · DC — Ward 2
Building permit — alteration and repair
PROJECT IS A LEVEL 2 ALTERATION AND NOT A SUBSTANTIAL IMPROVEMENT. GREEN BUILDING ACT DOES NOT APPLY. REVISION TO PERMIT B2308807 TO INCLUDE THE FOLLOWING AMENDMENTS: REMOVAL OF ALL WORK FOR THE NORTH COTTAGE/ FIELD HOUSE. BUILDING IS EXISTING TO REMAIN AND NOT IN SCOPE, EXCEPT FOR REPLACEMENT OF ONE EXTERIOR DOOR AND ROOF MAINTENANCE WORK. ADDITION OF ONE ACCESIBLE FAMILY RESTROOM IN THE SOUTH COTTAGE/ FIELD HOUSE. REMOVAL OF PROPOSED NEW INTERIOR SPACES IN THE SOUTH COTTAGE, ALONG WITH ASSOCIATED DEMOLITION WORK. REMOVAL OF ONE NEW RESTROOM IN THE SOUTH COTTAGE. ROOM WILL BE PLUMBED FOR FUTURE CONNECTIONS. REMOVAL OF OF ALL EXTERIOR WINDOWS REPLACEMENT. REMOVAL OF ELECTRICAL TRANSFORMER DUE TO REDUCTION OF SCOPE. UPDATED IRRIGATION PLUMBING CONNECTION LINES AND POWER REQUIREMENTS FOR IRRIGATION CONTROL SYSTEM BASED ON FIELD VERIFICATIONS. UPDATED POWER CONNECTIONS AND REQUIREMENTS FOR POLE LIGHTS BASED ON FIELD VERIFICATION
Applicant: KARINA BAXTER · Owner: DISTRICT OF COLUMBIA
Building permit — mechanical
Owner: DISTRICT OF COLUMBIA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.