WASHINGTON, DC 20007 · DC — Ward 2
Building permit — miscellaneous
Continuation of normal construction operations on Friday June 19th including painting, drywall, millwork, etc.
Applicant: HANNAH BRAZELL · Owner: TRUSTEES FOR HARVARD UNIVERSITY
Building permit — permit
Building permit — miscellaneous
Continued construction operations from 7:00am - 3:30pm, on President's Day 2/16/2026. Work will include flooring, masonry, mechanical and plumbing trim out, electrical trim out, drywall, and tile installation.
Applicant: HANNAH BRAZELL · Owner: TRUSTEES FOR HARVARD UNIVERSITY
Building permit — miscellaneous
Requesting approval to continue normal construction operations on Monday 1/19/26, which is Martin Luther King Day. Hours requested are 7:00am - 3:30pm. Work to include stone masonry, roofing, installation of doors, and finishes work inside the building (drywall, painting, flooring, tile). A letter of support to continue construction on MLK Day from the ANC Representative Daniel Chao is attached as supplemental documentation
Applicant: HANNAH BRAZELL · Owner: TRUSTEES FOR HARVARD UNIVERSITY
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.