WASHINGTON, DC 20002 · DC — Ward 5
Building permit — plumbing and gas
Owner: STODDARD, KAITLIN V
Building permit — alteration and repair
SCOPE OF WORK IS FOR INTERIOR RENOVATION ONLY OF EXISTING BASEMENT FLOOR. THERE IS NO WORK ON FIRST OR SECOND FLOOR LEVELS. THERE ARE NOT ANY CHANGES TO THE EXTERIOR, STRUCTURE, OR HVAC SYSTEMS OF THIS RESIDENCE. THE WORK WILL CONSIST OF THE FOLLOWING PARTS: EXISTING BATH RENOVATION. REPLACE ALL FIXTURES, FITTINGS, AND FINISHES. REPLACEMENT AND RELOVATION OF WASHER/DRYER. REPLACEMENT OF WATER HEATER WITH NEW TANKLESS UNIT. NEW FINISHES ON STAIRS TO BASEMENT. NEW INTERIOR FINISHES INCLUDING FLOOR, DOOR AND CASE TRIM. NEW OFFICE AREA. NEW REC ROOM WITH BUILT-IN CABINETRY. MINOR ELECTRICAL WORK INCLUDING NEW LIGHTING.
Applicant: KAITLIN STODDARD · Owner: STODDARD, KAITLIN V
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.