WASHINGTON, DC 20036 · DC — Ward 2
Building permit — elevator - new
Historic- Installation of new commercial vertical platform lift
Applicant: ELLI SMITH · Owner: UKRAINE HOUSE DC FOUNDATION
Building permit — variance
This is to request a variance to the 2017 DC Building Code section 30001.2 & commercial cod ASME A18.1-2020 referring to the maximum travel distance of 168 inches (14 ft.)
Applicant: BASHAR SALAMEH · Owner: RUSLAN FALKOV
Building permit — electrical
Owner: UKRAINE HOUSE DC FOUNDATION
Building permit — plumbing and gas
Owner: UKRAINE HOUSE DC FOUNDATION
Building permit — addition alteration repair
SCOPE OF WORK: RECONFIGURATION OF OFFICE SPACE BY NEW OWNER DEMOLITION: PARTIAL DEMOLITION OF EXISTING CLOSETS, DOORS, WINDOWS AND NON-LOAD BEARING WALLS IN THE SECOND FLOOR. DEMOLITION OF BATHROOM IN THE SECOND FLOOR. DEMOLITION OF SHED ROOM IN THE BACK OF BUILDING. ALTERATION WORK: NEW BATHROOMS, NEW CLOSET, NEW PARTIAL CEILING, AND NEW FLOORING. INSTALL NEW ENCLOSURE WALL FOR NEW ELEVATOR INSTALLATION MEP WORK: NEW WIRING, NEW OUTLETS, LIGHTING AND LIGHT SWITCHES, NEW EXHAUST FAN FOR BATHROOM, NEW PLUMBING.
Applicant: BASHAR SALAMEH · Owner: UKRAINE HOUSE DC FOUNDATION
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.