WASHINGTON, DC 20006 · DC — Ward 2
Building permit — alteration and repair
In the Commission of Fine Arts jurisdiction area FULL FLOOR AT LEVEL 05 AND THE ADDTION OF A CONNECTING STAIR WITH FLOOR 6. ARCHITECTURAL WORK INCLUDES THE DESIGN OF A NEW STAIR, NEW GYPSUM BOARD PARTITIONS, GLASS PARTITIONS, OPERABLE PARTITION, CEILINGS, AND FINISHES. LIFE SAFETY / FIRE ALARM WORK INCLUDES ADDING AND RELOCATION OF SPRINKLER HEADS AND FIRE ALARM AUDIBLE AND VISUAL DEVICES. STRUCTURAL WORK INCLUDES SLAB DEMO AND CONSTRUCTION OF A NEW NON-EGRESS COMMUNICATING STAIR BETWEEN FLOORS 5 & 6 MECHANICAL WORK INCLUDES NEW DUCTWORK, AIR UNITS AND DIFFUSERS, AND SUPPLEMENTAL UNITS FOR MEETING SPACES AND SERVER ROOM. ELECTRICAL WORK INCLUDES CONNECTIONS FOR ALL EXIT SIGNS, EMERGENCY LIGHTING, TENANT LIGHTING, AND POWER FOR TENANT EQUIPMENT. PLUMBING WORK INCLUDES NEW FIXTURES IN TENANT PANTRIES AND RESTROOMS.
Owner: UNITED UNIONS INC
Building permit — addition alteration repair
Commission of Fine Arts jurisdiction area INTERIOR AND EXTERIOR ALTERATION AND EXPANSION OF AN EXISTING MECHANICAL PENTHOUSE INTO A CONFERENCE CENTER. PROJECT INCLUDES 2 ADDITIONS TO THE ROOF, A NEW DECK, OPERABLE INTERIOR AND EXTERIOR PARTITIONS, NEW OVERBUILT FLOOR, ELEVATOR EXTENSION, EGRESS UPGRADES, NEW RAILING AND MEP SYSTEMS UPGRADES. THE SCOPE INCLUDES REMEMDIATION OF THE ROOF MEMBRANE, DRAINAGE SYSTEM, AND PATIO DECK.
Applicant: JOSEPH JARVIS (RAMCO) · Owner: UNITED UNIONS INC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.