WASHINGTON, DC 20006 · DC — Ward 2
Building permit — alteration and repair
CFA / H Replacement of copper metal roofs, replacement of low sloped membrane roofing systems, and large skylight
Applicant: ACCUPERMIT LLC · Owner: NATIONAL SOCIETY OF THE DAUGHTERS OF THE AMERICAN REVOLUTION
Building permit — elevator - alteration
CFA / H Modernization (1) Traction Elevator #2 to include: Replace Controllers, Car Fixtures, Hall Fixtures, Hoistway Eq. Hoistway wiring, Car Door Operator & Equipment, Hoistway Equipment, Traveling Cables, Cab Interior
Applicant: INSPECTOR STEVENS · Owner: NATIONAL SOCIETY OF THE DAUGHTERS OF THE AMERICAN REVOLUTION
Building permit — elevator - alteration
CFA / H Modernization (1) Hydraulic Elevator #3 to include: Replace Controllers, Power Unit, Car Fixtures, Hall Fixtures, Hoistway Eq. Hoistway wiring, Car Door Operator & Equipment, Hoistway Equipment, Traveling Cables, Cab Interior.
Applicant: INSPECTOR STEVENS · Owner: NATIONAL SOCIETY OF THE DAUGHTERS OF THE AMERICAN REVOLUTION
Building permit — alteration and repair
CFA / H FOR ELEVATOR REVIEW ONLY***INTERIOR WORK ONLY***REPAIR & REPLACE THE BELOW ITEMS IN THE E.M.R***Replace the elevator mainline disconnects, Replace the cab light disconnects, Replace lights and GFIs in EMRs and Pits, Replace pit access ladders, Replace EMR Doors.
Applicant: SAMUEL HARBAGE · Owner: NATIONAL SOCIETY OF THE DAUGHTERS OF THE AMERICAN REVOLUTION
Building permit — electrical
Owner: NATIONAL SOCIETY OF THE DAUGHTERS OF THE AMERICAN REVOLUTION
Building permit — electrical
Owner: NATIONAL SOCIETY OF THE DAUGHTERS OF THE AMERICAN REVOLUTION
Building permit — plumbing and gas
Owner: NATIONAL SOCIETY OF THE DAUGHTERS OF THE AMERICAN REVOLUTION
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.