WASHINGTON, DC 20002 · DC — Ward 5
Building permit — permit
test
Applicant: TEKLE, YONAS A · Owner: TEKLE, YONAS A
Building permit — alteration and repair
Scope of the work: remove and dispose of failed existing concrete along the right side if needed. Prepare and compact subgrade (~95%) and place 46 in concrete with broom finish for the existing concrete area, matching existing control/expansion joints and maintaining 12% slope for drainage. At the front, left side and back side, excavate and prepare subgrade for new concrete of similar thickness/strength with broom finish. Maintain erosion/sediment controls, protect adjacent areas/utilities. Work to comply with local requirements. 511 sq ft new and existing driveway repair
Applicant: TEKLE, YONAS A · Owner: TEKLE, YONAS A
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.