MONTGOMERY VILLAGE, MD, 20886 · Montgomery County
Building permit — commercial building
There are two elements to this project, as follows: 1. Replace the existing tub/shower with a walk-in shower. 2. Add a 48-inch wide by 40-inch tall opening in the non-load bearing wall between the kitchen and dining room.
Building permit — building residential permit
Interior work only,There are two elements to this project, as follows: 1. Replace the existing tub/shower with a walk-in shower. 2. Add a 48-inch (wide) by 40-inch (high) opening in the non-load bearing wall between the kitchen and dining room.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.